Bidding/Expert Consultation and Design The quotation consultation begins with our designer, estimator, and development expert.
Drafting BOM and Preparing Raw and Subsidiary Materials The construction BOM is drafted, and raw and subsidiary materials are ordered and prepared through a contract
Mold Manufacturing Mold for forming the exterior shape of a pontoon bridge manufactured The basic dimensions are determined in the mold
Mats, Roving, and Resin Lamination Exterior shape of pontoon bridges manufactured through molds Laminated with py as indicated on blueprint
Demolding Exterior structure removed from the mold Exterior structure completed
Interior Bulkheads Assembly Interior reinforcement bulkheads manufactured and assembled
nterior Floating Body Assembled nterior Floating Body Assembled
Assembling Burckella Exterior Burckella assembled
Protective Guards Assembly Shock-prevention protective guards assembled
Anchor Line Guards, Cross Bollard Installation Interior anchor line guard and cross bollard assembled
Connection Rods Assembly Pontoon bridge connection rods assembled
Upper Cover Assembly Upper Cover lamination and OVERLOCK
Transportation Transportation to location of installation
Top Layer Concrete ConstructionPouring the top layer concrete
InstallationTransportation to location of installation and ASS’Y assembly
CompletionInspection after completion of installation