Pile Construction

  • 01

    Bidding/Expert Consultation and Design The specialized design begins after the bidding, planning of design, and selection of the location for installation

  • 02

    Drafting BOMs and Preparing Raw and Subsidiary Materials General preparation such as confirming government-supplied materials, preparing subsidiary materials, and checking construction plans

  • 03

    Survey The shape of the installation location is figured out and the locations to plant piles are measured and marked

  • 04

    Pile Assembly The process of drilling the sea floor at the surveyed location and planting the piles at the same time

  • 05

    Pile Rust-Prevention Surface TreatmentThe painting and coating process on the outer cover to prevent rust from occurring inside after planting the pile

  • 06

    Pier and Pile Assembly The process of assembling and fixing between ship docking facilities and piles

  • 07

    Complete Inspection after completion of installation