Bidding/Expert Consultation and Design The quotation consultation begins with our designer, estimator, and development expert.
Drafting BOM and Preparing Raw and Subsidiary Materials The construction BOM is drafted, and raw and subsidiary materials are ordered and prepared through a contract
Mold Manufacturing Mold for forming the exterior shape of a pontoon bridge manufactured The basic dimensions are determined in the mold
Gel Coating Job after Coating Mold Interior with Wax Gel coating (exterior surface treatment) of main body done in mold
MAT+ROVING+RESIN Lamination Laminated onto mold surface for formation
Bulkhead and Reinforcement OVERLAY Interior reinforcement and bulkhead overlaid with FRP
Demolding Product made in mold removed from the mold, exterior structure completed
Upper Cover Manufacturing Upper cover manufactured (method determined by specifications)
Internal Floating Body Installed Internal floating body installed and assembled (divided into EPS & FORM forms based on specifications)
Subsidiary Equipment Assembly Protective guards, Cross Bollard, Anchor Line Guard, and Connective Rods assembled according to specifications
Cover Assembly Exterior cover assembled ▶ Complete
Draft test according to client’s conditions (Option for client)
Installation Transported to installation location, client-requested location selected and installed
Inspection Inspection after completion of installation